• UV CIPP PIPE LINING TECHNOLOGY?

    Section image

    UV CIPP (Ultraviolet Cured-in-Place Pipe) is an advanced trenchless technology used to rehabilitate damaged pipelines, such as sewers and stormwater drains, without the need for extensive excavation. In this method, a UV resin-impregnated glass-reinforced polyester (GRP) liner is inserted into the existing pipe through two access points. Once positioned, a bladder inflated with air ensures the liner fits snugly against the host pipe’s interior. Ultraviolet light is then used to cure the resin, creating a new, highly durable pipe within the old one. Compared to traditional ambient or thermal curing methods, UV CIPP offers faster curing times, reduced costs, lower risks, and superior results, making it an efficient and environmentally friendly solution for repairing cracked, leaking, or broken pipes in residential, commercial, and municipal applications.

  • How UV CIPP Technology is Transforming Pipeline Repair?

    UV CIPP represents an advanced trenchless rehabilitation method that utilizes ultraviolet light to cure resin-saturated liners within existing pipelines. This innovative approach offers distinct advantages over traditional ambient or thermal curing processes, delivering superior results while significantly reducing installation risks, project costs, and resource requirements.

    Particularly effective for underground drainage systems including sewers and stormwater networks, UV CIPP technology extends pipeline service life while enhancing hydraulic performance - all with minimal environmental impact. The process is applicable to various pipe geometries (circular, egg-shaped, and similar non-circular profiles) with diameter ranges from DN200 to DN1800mm, making it a versatile solution for municipal infrastructure rehabilitation.

  • UV CIPP Lining Process

    Section image

    1. Insert Sliding Film

    The existing pipe is initially inspected for damage assessment. A sliding film is inserted to facilitate the smooth introduction of the liner, ensuring that the installation process is efficient and effective.

    Section image

    2. Liner Insertion

    Following the preparation, the liner is pulled through the pipe from the entry point to the exit point. This method guarantees complete coverage of the damaged section, preventing any exposure of the old pipe.

    Section image

    3. Packers Installation

    After the liner is in position, packers are installed at both ends of the pipe. This step is crucial for creating a seal that will allow for proper inflation and curing of the liner.

    Section image

    4. Inflation and Expansion

    The packers are inflated to expand the liner, pressing it firmly against the interior walls of the existing pipe. This ensures a tight fit and prepares the liner for the curing process.

    Section image

    5. UV Curing Process

    Once the liner is fully expanded, UV light is introduced into the pipe. The UV light activates the resin within the liner, curing it thoroughly and forming a durable, structurally sound lining that conforms precisely to the existing pipe's shape.

    Section image

    6. End Treatment

    After the curing process, end treatment is performed to finalize the installation. This may involve trimming the liner to proper lengths and ensuring that all connections are restored.

    Section image

    7. Final CCTV Inspection

    A comprehensive CCTV inspection is conducted post-installation to verify the integrity of the liner. This step ensures that the installation meets quality standards and that the pipe is ready for operation.

    Section image

    8. Rehab Completed

    With the final inspection approved, the rehabilitated pipeline is now fully restored to optimal performance.

  • Case Studies

  • Section image

    Equpment Features

    1. Features imported 1500W mercury lamps with precision digital control.
    2. User-friendly software provides real-time monitoring and control.
    3. HD front/rear cameras with central console display for complete process documentation.
    4. Independent high-power fans for adaptable airflow across pipe diameters.
    5. Integrated sensors monitor liner temperature throughout curing.
    6. Fully equipped for immediate deployment upon delivery.

  • Generator

    50KW

    Control System

    15-inch touch screen and 15.6-inch monitoring screen

    Cable Reel

    Cable length 150m

    UV Light Chains

    Applicable pipe diameter DN150-DN1800mm

    Packers

    Applicable pipe diameter DN150-DN1800mm

    Air Blower

    Rated power: 15 kW, Quantity: 2 units

  • Rent UV CIPP Equipment

    Specify your pipe diameter and project timeline to receive a customized UV lining solution proposal within 24 hours.